The shortage that stops the line is knowable on Monday.

Bills of material, routings, work orders and material requirement runs on the same meta model as procurement and inventory, so a plan change reprices the shortage list immediately, and the shop floor records what it actually made, batch by batch.

BOM ยท routing ยท work orderMRP runs & shortage listsShop-floor executionQuality plans & traceability
One plan ยท material to promiseFinite capacity, BOM demand, inbound material and customer promise meet before a schedule changes.WO-3381 ยท BRG-4418 ยท precision bearing
AMOGA Finite scheduleFinite plan ยท 16 Aug ยท Shift A/B10:20 ยท shortage boundary
06:0008:0010:0012:0014:0016:00
Line 3Assembly ยท 96%
WO-3370Model CChangeover
WO-3381Model A ยท 420180 bearings short
WO-3389Model DQueued
Line 1Fabrication ยท 78%
WO-3376Batch 18 ยท 180Running to takt
PM-104PMFixed window
Line 4Packaging ยท 89%
WO-3364DomesticPack
WO-3369Export ยท 260Overtime watch
Line 2Alternate ยท 64%
WO-3378Model BFirm
OPENChangeover windowOption space
Firm / running Constraint Option space
WO-3381 ยท constraint roomBRG-4418 ยท precision bearing180 short ยท replan heldReview recorded ยท plan unchanged
Required420โˆ’Available240=Shortage180
Dependency consequenceSO-48211 ยท Aster Auto120 units at risk ยท 17 Aug ยท 10:00SO-48226 ยท Northstar Mobility60 units at risk ยท 17 Aug ยท 16:00
Named checkpointMeera Iyer โ†’ Vikram Rao
9:41โ€ขโ€ขโ€ข
Line 3 shortage reviewWO-3381 ยท Model A ยท 420 unitsDecision due
L3

Finite planAssembly ยท Model A420 units

Current constraintBRG-4418 ยท 180 short

PO-7194 ยท 17 Aug 11:00 ยท Inventory snapshot ยท 09:16

Customer consequenceSO-48211 ยท Aster Auto

120 units ยท promised 17 Aug 10:00

โœฆ Prepared ยท not committedSplit 240 / 180 ยท protect both customer orders ยท +โ‚น61 K illustrated cost

Two customer orders protected.

Named authorityMeera Iyerโ†’Vikram Rao
Illustrative product experience and operating data, not customer results.No material reservation, line sequence, schedule or customer promise changes automatically.
Requirement โ†’ finite plan โ†’ constraint โ†’ commitment

The production plan is a live agreement between material, line and promise.

WO-3381 cannot be recovered by dragging a block. Its BOM shortage, neighbouring jobs, inbound timing, customer allocation and commitment authority all move together.

01Model

BOM and routing share one plan

Requirements, effective revisions and line capabilities define what the work order really needs.

WO-3381 ยท BOM-A17 ยท revision 7
02Load

Capacity is finite and visible

Calendars, shifts, changeovers and active work share the same time boundary.

Finite plan ยท 16 Aug ยท Shift A/B
03Trace

A shortage reaches the promise

Material risk stays connected to the work order and both affected customer orders.

BRG-4418 โ†’ WO-3381 โ†’ SO-48211
04Commit

A feasible option still needs authority

The planner prepares sequencing; the plant head commits or returns the scenario.

Meera Iyer โ†’ Vikram Rao
What changes

Planning that survives contact with the shop floor.

The planning module is only as good as what the floor tells it. These rows are about closing that loop within the shift, not at month end.

01
Bills of material

Multi-level BOMs, revised by a change request queue.

โ†’
Rebuilt agentic

BOMs and routings versioned with effective dates and where-used analysis, so an engineering change shows every order it will affect before it is released.

02
Planning runs

An overnight MRP run, read the next morning.

โ†’
Rebuilt agentic

Requirement runs on demand against live stock, open POs and firm orders: the shortage list is costed, dated and assigned to a buyer.

03
Scheduling

A finite-capacity plan, overtaken by breakdowns.

โ†’
Rebuilt agentic

Work centre capacity, changeover and maintenance windows in the schedule; a breakdown triggers a re-plan with the orders it will delay named.

04
Shop-floor execution

Production reported at end of shift, on paper.

โ†’
Rebuilt agentic

Operators confirm operations, downtime reasons and scrap at the station on a tablet, so the plan sees reality within the shift.

05
Quality

Inspection recorded, and a hold managed by conversation.

โ†’
Rebuilt agentic

In-process and final inspection plans with sampling; a failure raises a hold that physically blocks the batch from dispatch.

06
Traceability

Batch records assembled when a customer complains.

โ†’
Rebuilt agentic

Raw batch to finished batch to shipment on one trail, so a recall scopes in minutes, with the customers named.

Finite plan ยท governed recovery

Replan the consequence, not just the coloured block.

A line movement changes material, capacity, cost and customer promise. Keep those dependencies together while a named planner prepares and a plant head commits.

Illustrative product sequence ยท no schedule or promise changes automatically.
AMOGA WO-3381 ยท production controlFinite Plan Recovery WorkbenchFinite plan ยท 16 Aug ยท Shift A/B
Constraint unresolvedReview recorded ยท plan unchangedMeera Iyer ยท Production planner
WO-3381 ยท 420 unitsWhat changes if the material cannot meet the start?Material risk
01 ยท Finite plan

The constraint sits inside the line sequence

Line calendars, changeovers and each neighbouring work order remain visible around WO-3381.

Decision factLine 3 ยท 96% load ยท shortage at 10:20
Line 3A96%B92%C74%
Line 2A64%B71%C58%
Line 4A89%B94%C62%
09:14Finite schedule refreshedLine calendars and changeovers joined
09:16Material gap surfacedBOM-A17 netted to inventory and PO-7194
09:18Customer impact tracedSO-48211 and SO-48226 linked to WO-3381
09:22Replan preparedNo schedule commitment changed
Illustrative product experience and operating data, not customer results.
Scenario comparison

Finish, cost and service in the same decision.

Compare three finite scenarios. Selecting one changes the visible plan consequence, but it remains prepared until the named authority records a decision.

AMOGA WO-3381 ยท scenario boardWhich recovery protects the promise?3 finite options
Selected consequenceTwo orders protected ยท +โ‚น61 K illustrated cost
AMOGA WO-3381 ยท plan authorityEvidence. Preparation. Commitment.
MI
Production planner ยท named checkpoint

Meera Iyer

Validate sequence, constraint and customer allocation.

WO-3381 ยท BOM-A17 ยท line calendarsMay prepare or return the scenario.
WO-3381 retains every decision reason.
Named plan authority

A feasible scenario is not a committed schedule.

Meera owns the plan logic, Rahul the inbound evidence and Vikram the final commitment. Their boundaries remain visible.

Complete planner role task

Carry the work order, shortage and customer promise together.

The planner task shows the record, material exception, evidence, consequence, prepared scenario and named commitment gate.

One complete role task, not a miniature status card.
9:41โ€ขโ€ขโ€ข
Line 3 shortage reviewWO-3381 ยท Model A ยท 420 unitsPlanner review
Current constraintBRG-4418 ยท 180 short

Inventory snapshot ยท 09:16 ยท PO-7194 ยท 17 Aug 11:00

EvidenceBOM-A17 rev 7 ยท Inventory 09:16

Line 2 has an open changeover window.

ConsequenceSO-48211 ยท Aster Auto

120 units ยท promised 17 Aug 10:00

โœฆ Prepared ยท not committedSplit 240 / 180 ยท protect both customer orders ยท +โ‚น61 K illustrated cost

Meera reviews; Vikram commits or returns.

Named authorityMeera Iyerโ†’Vikram Rao
Schedule unchangedReview ready ยท commitment heldWO-3381 retains the trail
One manufacturing spine

What the plant gets.

Discrete, process and job-work models are all supported; the routing is yours, not a template. The plan stays connected to what the plant can make, what material exists and what customers were promised.

Define & plan

BOM & routing

Multi-level bills with alternates, scrap factors, effective dates, where-used analysis and versioned routings by work centre.

multi-level ยท effective ยท alt

Demand & forecast

Firm orders, forecasts and safety stock combined into a demand plan, with consumption tracked against forecast.

forecast ยท consume ยท safety

Material requirement run

Netting against stock, open purchase orders and work orders, producing a dated, costed shortage list with buyer assignment.

net ยท shortage ยท assign
Schedule & execute

Capacity & scheduling

Work centre calendars, changeover matrices, maintenance windows, and re-scheduling when a breakdown is reported.

capacity ยท changeover

Work order execution

Operation confirmation, material issue and back-flush, downtime reasons, scrap and rework at the station.

confirm ยท downtime ยท scrap

Quality plans

Incoming, in-process and final inspection with sampling plans, non-conformance records and disposition decisions.

sampling ยท ncr ยท disposition
Trace & recover

Job work & subcontract

Material issued to a vendor, tracked at their site, received back with yield reconciliation and rejection handling.

issue ยท yield ยท reconcile

Traceability & recall

Genealogy from raw batch to finished batch to customer shipment, with a recall workspace that names the exposure.

genealogy ยท recall scope
Prepared work ยท retained authority

A breakdown that re-plans the week, not the quarter.

The system can surface constraints and compare feasible plans. It cannot reserve material, resequence the plant or change a customer promise by itself.

โ€œwhich customer orders slip if work centre four is down for two daysโ€
Plan to dispatched batch ยท governed lanerun 6a83 ยท replayable
1Demand firmedORDERS ยท FORECAST
2Shortage agentNET ยท DATE ยท COST
3Capacity holds?WORK CENTRE ยท CHANGEOVER
4Plant headCOMMITS THE SCHEDULE
5Produce & inspectCONFIRM ยท SAMPLING ยท HOLD
6ReleasedBATCH TRACED ยท TRAIL PINNED
Evidence โ†’ scenario โ†’ named commitment.
Bounded work around the plan

Three agents on the plan. The plant head commits it.

Agents prepare constraint evidence and scenarios. Planners and plant leaders keep consequential authority.

โœฆ shortage-watch

Nets requirements continuously and raises the shortage with its date, its cost and the buyer who owns it.

purchase decisions stay human
โœฆ schedule-replan

Re-sequences work orders after a breakdown or a rush order and names the customer orders it will delay.

plant head commits the schedule
โœฆ quality-hold

Watches inspection results and holds the batch the moment a plan fails, before it can be dispatched.

release needs a disposition decision
โœฆ yield-watch

Tracks yield, scrap and downtime by shift and line and flags the drift while the cause is still visible.

reason codes come from the floor

Bring one BOM. Run the shortage list on it.

A 90-minute working session: your bill of material, routing and quality plan drafted as an FRS, approved, and generated to a staging tenant with a requirement run against real stock.

Book the manufacturing sessionโ† All applications
For your technical team

Production is meta on the platform: the same inventory locations, the same vendor master as procurement, and durable execution behind every work order, with costing left to your ledger.

Platform architecture: six planes โ†’Durable execution & replayable audit โ†’Security, compliance & data residency โ†’